How much CAPE would an ideal parcel need for a target updraft?
Invert the ideal parcel speed equation to calculate how much CAPE corresponds to a target vertical speed, then practice with six problems.
In the lossless parcel estimate, CAPE equals one-half the square of the target vertical speed. This calculation gives the energy per unit mass required by the ideal model for a parcel starting from rest.
Prerequisite. Review ideal parcel speed.
| Target speed (m/s) | CAPE (J/kg) |
|---|---|
| 30 | 450 |
| 60 | 1,800 |
| 90 | 4,050 |
Rearrange the energy equation
Let C be CAPE in J/kg and w be the target upward speed in m/s. The ideal work-energy relationship is w²/2 = C, with zero starting speed and no losses. For 60 m/s, square the speed to obtain 3,600 m²/s² and halve it to find 1,800 J/kg. Doubling w quadruples C. Review the forward calculation.
Practice questions
- How much CAPE gives an ideal 30 m/s?
Hint
Square 30 before dividing. - Find the CAPE corresponding to 60 m/s.
Hint
Square 60. - By how much does the required CAPE rise from 30 to 60 m/s?
Hint
Subtract the two energies. - Convert a 144 km/h target before using the equation.
Hint
Divide kilometres per hour by 3.6. - A student writes C = (w/2)². At 30 m/s, by what factor is the result off?
Hint
Compare the denominator of the two squared expressions. - Can an observed 60 m/s updraft establish that ambient CAPE was exactly 1,800 J/kg?
Hint
List forces and losses omitted from the exercise.
Worked answers
Answer 1
30²/2 = 450 J/kg.
Answer 2
60²/2 = 1,800 J/kg.
Answer 3
1,800 − 450 = 1,350 J/kg.
Answer 4
144 km/h = 40 m/s. Then 40²/2 = 800 J/kg.
Answer 5
Their calculation gives 225 J/kg, half the correct 450 J/kg.
Answer 6
Observed parcel speed can reflect loading, entrainment, dynamic pressure forces and prior vertical motion. Derive environmental CAPE from an appropriate parcel and sounding.
- 30²/2 = 450 J/kg.
- 60²/2 = 1,800 J/kg.
- 1,800 − 450 = 1,350 J/kg.
- 144 km/h = 40 m/s. Then 40²/2 = 800 J/kg.
- Their calculation gives 225 J/kg, half the correct 450 J/kg.
- Observed parcel speed can reflect loading, entrainment, dynamic pressure forces and prior vertical motion. Derive environmental CAPE from an appropriate parcel and sounding.